CONSULTANCY:

As General Manager of Intercontinental Consultants and Technocrats Pvt. Ltd. (ICT), New Delhi

  • Hydrologic investigations, analysis and estimation of longitudinal and cross-drainage requirements.
  • Working out requirements of new culverts and replacement / rehabilitation of existing ones, design appropriate culvert size.
  • Hydraulic & hydrologic computation for bridges.
  • Planning and design of drainage system, and drawings for road side drains and other related structures, Airport drainage.

» Different projects handled:

  • Feasibility study and DPR for rehabilitation and upgrading to 4/6 lane divided carriageway configuration of EW corridor (Contract Package No 2: Chittorgarh – Kota section km 222 to km 397) of NH-76 in Rajasthan (ADB funded). Client: National Highways Authority of India.
  • Feasibility study and detailed project report for four laning and strengthening of Dharamtul-Nagaon section (km 231 to km 274) of NH-37 including Nagaon Bypass connecting NH-36 in Assam under Phase III programme of NSEW Corridors. Client: National Highways Authority of India.
  • Feasibility study & detailed project report for 4 laning and strengthening of West Bengal Border to Gairkatta section (km 145 to km 255) of NH-31C in West Bengal (NSEW corridor Phase III-Contract Package C-III/9). Client: NHAI. Estimated cost of Project: Rs. 7,500 million.
  • Feasibility study & detailed project report for 4 laning and strengthening of Gorakhpur to Ayodhya section (km 135 to km 265.7) of NH-28 in Uttar Pradesh (NSEW corridor Phase III-Contract Package C-III/2). Client: NHAI. Estimated cost of project: Rs 7,000 million.
  • Feasibility study and preparation of detailed project report for improvement, rehabilitation, strengthening and widening of Gobindpur - Jamtara - Dumka - Barhat - Sahebganj Ghat Road (330 km) in Jharkhand. Client: PWD, Govt. of Jharkhand.
  • Feasibility study and detailed project report for rehabilitation and strengthening of existing 2-lane road and widening to 4/6 lane dual carriageway configuration of Nagpur - Durg section of NH-6 in the states of Maharashtra and Chattisgarh. Client: Ministry of Road Transport and Highways. Estimated cost of the Project: US $ 230 million.
  • Development of adequate road connectivity to Cochin Port in Kerala (Detailed project preparation for widening of four lanes of NH-47 from km 0.00 to km 5.9 and km 348.382 to km 358.300, NH-47 and strengthening of the existing pavement of NH-47; detailed project preparation of a four-lane new road of length 15.3 km). Client: National Highways Authority of India. Cost of the Project: Rs 3383 million.
  • Survey, investigation and project preparation including detailed engineering design of Madhya Pradesh State Road Project (Group D). Client: Govt. of Madhya Pradesh, P.W.D. Estimated cost of the project US $ 75 million.
  • Extension of Runway and Associated Development Works – Gaggal Airport, Himachal Pradesh, New Mumbai Airport India. Client: National Airports Authority, Govt. of India.
  • Hydrologist, Preparation of detailed project report along with cost estimates and bidding documents for four laning & strengthening of the existing 2 lanes of Jalandhar-Amritsar section of NH-1 (80 km) in the state of Punjab (Package I) – Second National Highway Project (World Bank funded). Client: Ministry of Road Transport & Highways. Cost of the Project: US $ 104 million.
  • Preparation of detailed project report for 4-laning of Chingelpet - Tindivanam section of NH-45 in Tamil Nadu on BOT basis and preparation of technical schedules. Client: National Highways Authority of India. Cost of the Project: US $ 88 million.
  • Feasibility and detailed project report for rehabilitation and upgrading of existing 2-lane road to 4/6 lane divided carriageway configuration from km 44.00 to km 59.50 Lucknow – Kanpur section of NH - 25 in the State of Uttar Pradesh. Client: National Highways Authority of India. Cost of the Project: Rs 710 million.
  • Feasibility study and detailed engineering design for four laning and strengthening of the existing two lanes NH-6 (Package VIII) from km 17.6 to km 210.0 in West Bengal, Orissa and Bihar. Client: National Highways Authority of India. Cost of the Project: US $ 280 million.
  • Feasibility study and project preparation including detailed engineering design for four laning and strengthening of the existing two lanes from km 199.66 (Agra) to km 393 (Sikandra) section of NH-2 in Uttar Pradesh (World Bank funded). Client: National Highways Authority of India. Cost of the Project: US $ 270 million.

As an Individual Consultant, ICT, New Delhi (2005 onward)

  • Adviser to projects: NH-31, NH-27, NH-76, NH-12, NH-11, NH-1 A, NH-34, NH-57, NH-44, Taj Expressway, Kabul Airport, NH-14, Ganga and Yamuna Expressways, Mumbai-Vadodara Expressway etc.

As an Indiv. Consultant, M/s Scott Wilson India Pvt. Ltd., New Delhi (2006 onward)

  • Feasibility Report & DPR on sedimentation and anabranching and training of river Mahananda u/s of a major bridge on NH-31.
  • Feasibility Report & DPR on Training River Bagmati near a major bridge on NH-57. crossing river Bagmati.
  • DPR for Command Area Dev. Of Bina Irrigation Scheme in M.P.
  • DPR for Gyspa Dam Project, Govt. of H.P.

As an Indiv. Consultant at M/s Aquagreen Engineering Management Pvt. Ltd., New Delhi

  • Hydrologic and hydraulic design of H.E. projects e.g. Bhilangana III HE Project in Uttarakhand, Demway Upper H.E. project and Mechuka H.E. Project in Arunachal Pradesh.

As an Indiv. Consultant to M/s Mahendra Raj and Consultants, New Delhi

  • Detailed report on scour in river Yamuna for the new bridge from Shantivan to Geeta Colony.

As an Indiv. Consultant to M/s Indian Technocrats Pvt. Ltd., New Delhi

  • DPR for Kanhan River Bridge on NH-7 near Nagpur.

Individual Consultant for the project “Mandakini River Training near Kedarnath Temple” by D.D. Consultants, Ramboll India Pvt. Ltd., Gurugram

Individual Consultant for B&S consulting company at Gurugram for design of bridge foundation of a viaduct for Rambon - Banihal section of NH-1A (Now NH-44) in Jammu and Kashmir.